July 23rd
|
| |
Home
View Jobs
Post Job
View Resumés
Post Resumé
My Account
|
|
|
| Reference ID: | CV-AQZLCAW |
| Updated: | April 28, 2008 |
| Available: | Immediately |
| Will Relocate: | Yes |
| GIS Experience: | 2 years |
| Desired Salary: | 2,00,000 per Year |
| |
| | | | |
|
|
| | | jayanth S | | | | Educational Experience |
| (VTU) Basaveshwara Engineering College | Bagalkot | Degree: B.E Major: EEE Dates: September2000- May2005 |
| | | | Professional Experience |
| GIS Support Analyst | Deccan GIS Software Solutions | | Feb 2004- Till date | Bangalore | Software Tools: MSSQL Server 2005, ArcGIS Desktop9.2, ArcIMS9.2, ArcSDE 9.2, Tomcat 5.5.17, Apache 2.0.5.8, IIS, Arc Catalog
Installation and Configuration of Web Servers with the corresponding Servlet Engine for troubleshoot.
Establishing Database connections (3 tier connections, Direct Connections) between ArcIMS with the MSSQL database for storing the Spatial database, with and with out ArcSDE.
Trouble shooting the incidents logged by the Arc GIS Clients.
Upgrading Service pack for the Arc GIS software for optimizing the software.
| | Project Engineer | ABB | | June 2006 -Jan 2008 | Bangalore | Representing technical and management team-heads for BESCOM G.I.S (Geographical Information System) project.
Customizing Analyzer and Operator modules, Installation and troubleshooting Oracle/Java/Tomcat applications.
Importing AutoCAD to GIS application using Micro station.
Updating the Mapper Module, executing posted costumer data to the central database server, updating SQL queries for posted and un-posted networks, maintaining the backup servern-zconsumer mapping in G.I.S application.
Scheduling and planning day-to-day updates, conducting G.I.S application software training classes to BESCOM nodal officials and new trainees.
Representing ABB for management meetings like KPTCL and BESCOM meetings.
Managing troubleshooting processes.
Visiting respective project subdivisions for inquiring, preparing, maintaining and submitting of vital project related documentation.
Achievements in the Project:
1.Sorted the issue related to HT network in the GIS application, which was not feasible in the scope of Work till september07.
2.Sorted the solution for LT network print for a particular DTC with its network, which was the key requirement for customer handover.
|